Roadworks in and adjoining the ward

Below are current road and footpath works in the Rochester South and Horsted ward. Please be aware that occasionally something has just happened and has already been completed by the time it is notified to me. If you encounter something going on that isn't up here, do please let me know where and what it is (and, if possible, by when it is expected to finish) and I'll put it on this page for everyone's benefit.

If there is ongoing work that requires traffic control measures, this will be indicated by a traffic cone symbol, thus: Traffic cone

This page contains the following:


Go to top of page

Traffic cone Latest News on Current Major and Significant Road Works

Maidstone Road Chatham (A229) Blue Bell Hill roadworks
Not quite in the ward, but significant enough to report:
The Medway-bound carriageway of Blue Bell Hill between the Running Horse roundabout near Maidstone and the Lord Lees roundabout will be closed for extensive re-surfacing work from mid-evening on Friday 28th March to the early morning of Monday 31st March. This round-the-clock work will include new white lines and cats' eyes.

Maidstone Road, Chatham (A229) dual carriageway section
Regular, fortnightly single-day routine maintenance of this section of the A229 is planned for the following future dates:

  • 14th March 2008
  • 28th March 2008
  • 10th April 2008
  • 24th April 2008
  • 15th May 2008
  • 29th May 2008
  • 12th June 2008
  • 26th June 2008
  • 17th July 2008
These will involve lane closures. .
Go to top of page

Road/Footway Repairs & Resurfacing

Note: There have been a number of quick jobs affecting road traffic for just a day or two, in various locations during recent years. These have tended to be notified to us on the weekend after the work has been completed, which is why they have not been reported here unless one of us happened to encounter such work during our travels.


Go to top of page

Road Gritting

Just for information: We have eight gritter vehicles operating around the clock during the more severe snowy weather each winter. The salt bins are now being left in place, instead of being removed during the warmer months, as an economy measure.
Go to top of page